Base Layer

Base Course Installation

The first course of blocks is leveled and secured to the slab using a sealant adhesive to create a secure starting point for construction.

  • The first course of blocks is carefully positioned and leveled to create the foundation for all subsequent wall construction.
  • Adhesive sealant secures the initial block course to the slab, creating a strong connection between the wall system and foundation.
  • Proper placement of the base layer ensures straight walls, accurate dimensions, and efficient installation throughout the project.